Laserfiche WebLink
Run Date: 6/1512011 City of Everett-Public Works Department Cutoff Date: 6/10/2011 <br /> Time: 2:28 PM Contract Estimate Voucher <br /> Project: 224 For Work Order 43141 Contractor: TRI STATE CONSTRUCTION <br /> Replacement of Water Transmission Estimate x35 P 0 BOX 3686 <br /> Lines 2 and 3-Phase 6 --.1 <br /> WO 3141 810:$23,827,557.07 BELLEVUE WA 98009-3686 <br /> TOTAL BID:$23,408,712.07 <br /> Unit Plan Total Previous Present Total Previous Present <br /> Item i Description Units Price Quantity Quantity Quantity Quantity Amount Amount Amount <br /> 0053 Additional Steel Pipe Pile Splice EA 500.00 220.00 27.0000 27.0000 0.0000 13,500.00 13,500.00 0.00 <br /> 0054 Furnish Additional Steel Pipe Pile Length LF 100.00 2,160..00 551.0000 551.0000 0.0000 55,100.00 55,100.00 0.00 <br /> 0055 Installation of 240 LF of 48'Steel Waterline LS 341,500.00 1.00 1.0000 1.0000 0.0000 341,500.00 341,500.00 0.00 <br /> 0056 Rainier Welding-Detailing LS 63,060.06 1.00 1.0000 1.0000 0.0000 83,060.06 83,060.05 0.00 <br /> 0057 Rainier welding.Materials&Fabrication LS 166,264.01 1.00 1.0000 1.0000 . 0.0000 166,264.01 166,264.01 0.00 <br /> ' 0058 Add'I work for Ruskin Construction COR 441 LS 418,845.00 1.00 1.0000 0.0000 1.0000 418,845.00 0.00 418,845.00 <br /> Work Order Totals: 23.801,315.46 23,382,470.45 418,845.00 <br /> FA <br />