Run Date: 6/15/2011 City of Everett-Public Works Department Cutoff Date: 6/10/2011
<br /> Time: 2:28 PM Contract Estimate Voucher
<br /> Project: 224 For Work Order#3141 Contractor: TRI STATE CONSTRUCTION
<br /> Replacement of Water Transmission • Estirnatt'='35 P 0 BOX 3686
<br /> Lines 2 2nd 3-Phase 6
<br /> WO 3141 BID:$23,827,557.07 BELLEVUE WA 98009-3686
<br /> TOTAL BID:$23,408,712.07
<br /> Unit Plan Total Previous Present Total Previous Present •
<br /> Item n Description Units Price Quantity Quantity Quantity Quantity Amount Amount Amount
<br /> 0027 Elevated Walkway Pipeline#4 LF 200.00 4,300.00 4,510.2510 4,5102610 0.0000 902,050.20 902,050.20 0.00
<br /> 0028 Access Manway EA 11,500.00 6.00 6.0000 6.0000 0.0000 69,000.00 69,000.00 0.00
<br /> 0029 4•Air Vacuum/Air Release Valve Assembly EA 8,600.00 6.00 4.0000 4.0000 0.0000 34,400.00 34,400.00 0.00
<br /> 0030 Connection to Existing Elevated 46"Steel Pipe EA 9,200.00 4.00 4.0000 4.0000 0.0000 36,300.00 36,800.00 0.00
<br /> 0031 Electrical Continuity Bonding EA 140.00 120.00 120.0000 120.0000 0.0000 16,800.00 16,800.00 0.00
<br /> 0032 Remove&Dispose Existing Pipeline 413 LS 170,000.00 1.00 1.0000 1.0000 0.0000 170,000.00 170,000.00 0.00
<br /> 0033 Remove&Dispose Existing Pipeline#2 LS 165,000.00 1.00 1.0000 1.0000 0.0000 165,000.00 165,000.00 0.00 •
<br /> 0034 Remove&Dispose Existing Above Ground • LS 225,000.00 1.00 1.0000 1.0000 0.0000 225,000.00 225,000.00 0.00
<br /> 0035 Hydroseed Seed Mix 1 ACRE 1,700.00 1.00 0.0000 0.0000 0.0000 0.00 0.00 0.00
<br /> 0036 . Hydroseed Seed Mix 2 ACRE 1,300.00 1.00 0.0000 0.0000 0.0000 0.00 0.00 .0.00
<br /> 0037 Phase 5-Wetland Forest Planting LS 800.00 1.00 1.0000 1.0000 0.0000 300.00 800.00 0.00
<br /> 0038 Phase 5-Wetland Low Density Shrub Planting IS 350.00 1.00 1.00001.0000 0.0000 350.00 350.00 0.00
<br /> 0039 Phase 5-Wetland High Density Shrub LS 11,500.00 1.00 1.0000 1.0000 0.0000 11,500.00 11,500.00 0.00
<br /> Planting
<br /> 'Pt.. .0040 Phase 5 Fish Habitat&Wetland Enhancement LS 4,600.00 1.00 1.0000 1.0000 0.0000 4,500.00 4,600.00 0.00
<br /> V
<br /> 0041 Planting per Plant Schematic 1 LS 9,500.00 1.00 1.0000 1.0000 0.0000 9,500.00 9,500.00 0.00
<br /> 0042 . Planting per Plant Schematic 2 LS 13,500.00 1.00 1.0000 1.0000 0.0000 13,500.00 13,500.00 0.00
<br /> 0043 Planting Per Plant Schematic 3 LS 35,000.00 1.00 1.0000 1.0000 0.0000 35,000.00 35,000.00 0.00
<br /> 0044 Planting per Plant Schematic 4 LS 20,500.00 1.00 1.0000 1.0000 0.0000 20,500.00 20,500.00 ' 0.00
<br /> 0045 Planting per Plant Schematic 5 LS 26,500.00 1.00 1.0000 1.0000 0.0000 26,500.00 28,500.00 0.00
<br /> 0046 Planting Per Plant Schematic 6 LS 10,500.00 1.00 1.0000 1.0000 0.0000 10,500.00 10,500.00 0.00
<br /> 0047 Monitoring and Plant Establishment LS 36,000.00 1.00 1.0000 1.0000 0.0000 36,000;00 36,000.00 0.00
<br /> 0048 Traffic Control Plan and Maintenance LS 14,800.00 1.00 1.0000 1.0000 0.0000 14,800.00 14,800.00 0.00
<br /> 0049 Traffic Control Labor HR 43.00 1,056.00 1,064.5000 1,064.5000 0.0000 45,773.50 45,773.50 0.00
<br /> 0050 Record Drawings LS 5,000.00 1.00 1.0000 1.0000 0.0000 5,000.00 5,000.00 0.00
<br /> 0051 Vibration&Settlement Monitoring LS 150,000.00 1.00 1.0000 1.0000 0.0000 150,000.00 150,000.00 0.00
<br /> 0052 51'Steel Pipe Sections and Mantvays LS 85,000.00 1.00 1.0000 1.0000 0.0000 85,000.00 85,000.00 0.00 •
<br />
|