Laserfiche WebLink
9 <br /> Project: Sewer System Replacement"F"Project, Schedule B <br /> Change Order No.2 <br /> Change Order Effective Date: July 27, 2011 <br /> Contractor and City agree as follows: <br /> 1. The scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. With the exception of Washington State sales tax,the amount of the change order for <br /> the changes described in Exhibit A, represents complete compensation for the changes <br /> described in Exhibit A, including all direct and indirect costs and impacts. The contract <br /> price shall be adjusted as described in this Change Order. <br /> 3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the <br /> Mayor or his designee is authorized to direct Contractor to perform additional work. In <br /> calculating such threshold amounts, Washington State sales tax,if applicable to the <br /> Work, has been considered. <br /> 4. The duration of the Contract shall be adjusted to the extent described in this Change <br /> Order. <br /> 5. Contractor waives and releases any and all claims arising out of, or related to, this <br /> Change Order, the work described in Exhibit A, and all work and actual or constructive <br /> changes that occurred or began prior to the date of this Change Order, including, but <br /> not limited to, claims for equitable adjustment of time and compensation, delay, impact, <br /> overhead, or inefficiencies. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition, protest, dispute, claim or Contract Claim as required <br /> by the Contract Documents. If the Contract Documents establish a time period for <br /> notice of a differing site condition,protest, dispute, claim, or Contract Claim that ends <br /> after the date of this Change Order,but relates to work performed prior to the date of <br /> this Change Order, then this provision does not apply if the Contractor timely and <br /> properly submits such notice <br /> 6. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> u'� © 7 8 q c cc �-a +x� ry $f- ' 1 r J �. <br /> �-f a�1 - i.� {P �:�ii�� nom= � rrc�� .� r�a'e�'�s's�� 1"�-�T iA F i ��pL. f� vd��rl�t ,�fir' fc" _ t- �5yn �F .n i�i�� �41�kt-eY�'p�ffi. <br /> yi�/y � Y a F �1�r. �� y R.�le 'r 1,��.1��,� 1 -r 1 !G .� .4af b .` <br /> i f f: prs.—r 'E �' F � '�},$�1tt .r .' ,x �•: T,dr7y 1L 11 1 1 �y.7_r:i 4 1" k T Jlt`.f 5'y <br /> :..,..r g r.�,.ti, �z:C�;a.�i -.-�,__•. _. �� .r r,dt <br /> Attest: Approved As to Form: <br /> Mayor City Clerk City Attorney <br /> Date: Date: Date: <br /> Recommended By: <br /> Construction Project Engineer (if Engineering Depai fluent Director <br /> Manager(if applicable) Manager(if <br /> applicable) a splicable) <br /> ti •// 0/ /.//Date: V Date: .' If / i.te: / Dat-:' . 1 <br /> ( <br /> Page2of8 41 <br />