My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/09/07 Council Agenda Packet
>
Council Agenda Packets
>
2011
>
2011/09/07 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2017 9:56:54 AM
Creation date
5/5/2017 9:56:32 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/7/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Sewer System Replacement"F"Project, Schedule B <br /> Change Order No.2 <br /> Change Order Effective Date: July 27, 2011 <br /> 'ki3 S FK;S5"r 4 <br /> ppdot=0#t".�.� � w!,r." n3 3 <br /> � 0 .sKfF <br /> a ' -- � <br /> By — - ._ Date: e /it //( <br /> Officer <br /> Exhibit A—Description of Changed Work <br /> Change order#2 modifies three (3) existing bid items and adds two (2)new bid items on schedule 1, <br /> work order 30021; modifies one existing bid item on schedule 4,work order 30024; and adds fifteen <br /> bid items to a new schedule 5, tracked under new work order 30025 for tracking costs to restore streets <br /> on upper and lower Laurel Drive. <br /> Schedule 1, work order 30021 <br /> Bid Item#003 —Traffic Control Labor. Modify bid item#003, entitled "Traffic Control Labor", by <br /> adding 1500 hours of traffic control labor, at the unit price of$39.00/hour, resulting in a$58,500.00 <br /> contract price increase. <br /> Bid Item#065 —Driveway & Alley Approach, 6-inch Thick. Modify existing bid item#065 <br /> entitled, "Driveway &Alley Approach, 6-inches Thick",by adding 1,450 square yards of Driveway& <br /> Alley Approach, 6-inches Thick, at the unit price of$30.00 per square yard,resulting in a$43,500.00 <br /> increase to the contract. <br /> Bid Item#066—Concrete Curb or Curb and Gutter. Modify existing bid item#066 entitled, <br /> "Concrete Curb or Curb and Gutter",by adding 2,000 linear feet of concrete curb or curb and gutter, at <br /> the unit price of$12.00/linear foot,resulting in a$24,000.00 contract price increase. <br /> Bid Item#087—Utility Conduit Crossings. Add new bid item#087, entitled"Utility Conduit <br /> Crossings", to add 19 each utility conduit crossings at the agreed price of$2,000.00 per each,resulting <br /> in a$38,000.00 contract price increase. <br /> Bid Item#088—Perforated Drain Pipe with Drain Rock. Add new bid item#088 to work order <br /> 30021, for 880 linear feet of perforated drain pipe with drain rock, at the unit price of$14.00/linear <br /> foot, resulting in a$12,320.00 contract price increase. <br /> The net effect of modifying the above three (3)bid items and adding two (2)new bid items on <br /> schedule 1 results in a contract price increase of$176,320.00. <br /> Page 3 of 8 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.