Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 16 <br /> PROJECT TITLE: <br /> Amendment No. 1 to the Briefing COUNCIL BILL# <br /> Professional Services Proposed Action Originating Department Public Works <br /> Agreement with JacKaren Consent Contact Person Jenifer Galatas <br /> Consulting LLC for Action Phone Number 425-257-8229 <br /> Constructability Review and First Reading FOR AGENDA OF Sept. 14, 2011 <br /> Construction Project Second Reading <br /> Administration at the Water Third Reading <br /> Pollution Control Facility Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA A 4. <br /> Council President <br /> Location Preceding Action Attachments Department(s) Approval <br /> Water Pollution Control PSA, 12/1/10 Amendment Public Works <br /> Facility <br /> Amount Budgeted $8,160,000.00 <br /> Expenditure Required $25,500.00 Account Number(s): UP-3358 <br /> Budget Remaining $1,157,258.23 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> Consulting services for constructability review and construction project administration support is required for <br /> three phases of a major Water Pollution Control Facility plant expansion. Phase B1 was constructed in <br /> 2010/2011, Phase B2 is currently under construction and will be complete in 2012, and Phase C is under <br /> design. Amendment No. 1 to the Professional Services Agreement will fund the estimated level of effort <br /> required for on-going projects in 2011. <br /> Previous expenditures on this account include $2,131,442 for engineering design and construction services, <br /> $1,292,755.71 for the bidding and construction of Phase Bl, and $3,578,544 for the bidding and construction <br /> of Phase B2 including site preparation work for Phase C ($70M estimated construction cost). The total <br /> expenditure for this account to date is $7,002,741.77. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign Amendment No. 1 to the Professional Services Agreement with JacKaren <br /> Consulting, LLC for constructability review and construction project administration at the Water Pollution <br /> Control Facility in the amount of$25,500. <br /> X17 <br />