Laserfiche WebLink
9 <br /> available for net metering systems using water,wind, solar energy or biogas to generate electricity; and, <br /> WHEREAS, the addition of the net metering system will not exceed limits established by the PUD for intercon- <br /> nection of generators on the distribution feeder line, circuit, or network serving Customer. <br /> IN WITNESS WHEREOF,the parties have executed this Agreement as of the date first above written. <br /> AGREEMENT <br /> I. TERM <br /> This Agreement shall run from the date first set forth above until Customer's Generator is permanently <br /> disconnected from the PUD's electric system in conformity with the terms of this Agreement, provided that all <br /> obligations incurred before the termination of the contract shall continue in force until fully satisfied. <br /> As provided in Addendum I, and set forth in Washington State law, investment cost recovery incentives <br /> will not be available after June 30, 2020. <br /> As provided in Addendum II, the Customer shall meet the requirements of the Planet Power Award, in- <br /> cluding Customer Obligations,which extend for a term of ten(10)years ("Customer Obligation Period"). <br /> I I. CUSTOMER'S OBLIGATIONS <br /> A. Generator Specifications: Customer shall own and operate entirely at its own expense a fuel cell, <br /> a cogeneration system, or a facility that produces electrical energy using water, wind, solar energy or biogas <br /> from animal waste as a fuel ("Generator") located at 1022 Loy4c4Z tW,1,NA 1°019,1and conform- <br /> ing to the following specifications: <br /> MANUFACTURER: 1.7.--1h .tnS Q— <br /> MODEL(Name&Number): At S tureet v S V1 <br /> NAMEPLATE CAPACITY: •(0SZ 1c1J1O - <br /> FUEL OR ENERGY SOURCE (check one): <br /> WATER WIND )(SOLAR _BIOGAS FUEL CELL COGEN <br /> OUTPUT RATING: .Ion kW, 170,f2.0Qc Volts, 3 phase, 60 hertz. <br /> B. Interconnection Requirements: Customer shall install, operate and maintain, entirely at its own ex- <br /> pense, such equipment as is necessary to satisfy the safety,interconnection, and power quality requirements applicable <br /> to small electric power generators of the National Electric Code,National Electric Safety Code,Washington State Safe- <br /> ty Standards, PUD Electrical Service Requirements and Standards, Institute of Electrical and Electronics Engineers, <br /> and recognized safety testing laboratories, and such other safety, interconnection, and power quality requirements as <br /> the PUD may reasonably specify. Standard PUD requirements for interconnection and operation of customer-owned <br /> generating facilities(100 kW or less in size)are specified in Exhibit A,which is attached hereto and is incorporated by <br /> reference as if set forth fully herein. Requirements specifically applicable to this generator are specified in Exhibit B, <br /> which is attached hereto and is incorporated by reference as if set forth fully herein.Customer shall provide facilities to <br /> accommodate the PUD's metering equipment. <br /> C. Initial Operation: Either BEF or Customer shall submit equipment specifications and detailed <br /> plans, including one-line diagrams, for the installation of the Generator and associated interconnection, safety, <br /> Snohomish County PUD Net Metering Agreement Rev.4/2011 2 <br /> Reviewed: ALS 6-27-11 <br />