Laserfiche WebLink
9 <br /> and control equipment and wiring to the PUD for its review and advance written approval prior to their actual <br /> installation. Operation of generator shall not commence until the PUD has inspected and, where appropriate, <br /> tested the Generator and all associated equipment and wiring and has provided its written approval to com- <br /> mence parallel operations and Customer has, in addition, obtained all necessary inspections and regulatory ap- <br /> provals as specified in Subsection E of this Section II. <br /> D. Changes In Operation: Customer shall make no change in the Generator or associated equipment <br /> and wiring without prior written approval of the PUD. <br /> E. Legal Compliance: Customer, with assistance from BEF as appropriate, shall be responsible for <br /> obtaining any and all necessary easements, licenses and permits, or exemptions there from, as may be required <br /> by any federal, state, or local statutes, regulations, ordinances or other legal mandates. Customer shall operate <br /> the Generator in compliance with all applicable statutes,regulations, ordinances or other legal mandates. In ad- <br /> dition, Customer shall comply with all applicable provisions of the PUD Electrical Service Requirements and <br /> the PUD's Customer Service Regulations as they may be revised from time to time by the PUD's Board of <br /> Commissioners. <br /> III. NET METERING <br /> A. Metering Equipment: The PUD shall install and maintain an electronic kilowatt-hour meter ca- <br /> pable of registering the bi-directional flow of electricity at the Point of Interconnection at a level of accuracy <br /> that meets all applicable standards, regulations and statutes. The Point of Interconnection shall be defined as the <br /> point where electrical conductor owned by Customer makes physical contact with the PUD's electric system <br /> and feeds power onto or receives power from the PUD's electric system. The Point of Interconnection shall be <br /> specified in the plans and drawings submitted by Customer or BEF to the PUD. <br /> B. Interconnection Charge:Prior to commencing operations,and as a condition of receiving PUD approv- <br /> al for commencement of operations under Section II.C., Customer shall deposit with the PUD an interconnection <br /> charge consisting of: (1)the cost to the PUD to install any special or additional interconnection facilities on its electric <br /> system,if necessary to accommodate the flow of electricity from the Generator on to the PUD's electric system,includ- <br /> ing,but not limited to, control and protective devices,distribution transformer and reinforcement of its system; (2)any <br /> charges due the PUD under its Line Extension Policy; and, (3)the cost of any time and materials expended by PUD <br /> staff for engineering, reviewing plans, inspection, or other activities related to installation and interconnection of the <br /> Generator not otherwise recovered under the provisions of this Paragraph III.B. <br /> C. Charges for Electric Energy: Customer shall purchase any required electrical power from the <br /> PUD. Customer shall pay the minimum monthly fee specified in the PUD rate schedule applicable to customers <br /> in the same class as Customer as that rate schedule may be revised from time to time by the PUD's Board of <br /> Commissioners. In addition, Customer shall pay for the net energy used, or be credited with the net energy pro- <br /> duced, in accordance with the formula specified in the PUD's Schedule 200 -- Net Metering Program, as that <br /> Schedule 200 may be modified from time to time by the PUD's Board of Commissioners. The price for electric <br /> energy provided to or credited to the Customer under this Section III shall be the price charged for such electric <br /> energy by the PUD under the PUD rate schedule applicable to customers in the same class as Customer as such <br /> rate schedule may be revised from time to time by the PUD's Board of Commissioners. Customer shall be <br /> billed on the schedule applicable to customers in the same class and geographic area as Customer and shall be <br /> subject to the payment terms specified in the PUD's Customer Service Regulations. If, at the time of termina- <br /> 1 <br /> Snohomish County PUD Net Metering Agreement Rev.4/2011 3 <br /> Reviewed: ALS 6-27-11 6 3 <br />