Laserfiche WebLink
• EVERETT CITY"COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> Supplemental Agreement Briefmg COUNCIL BILL# <br /> Number 1 to the Local Agency Proposed Action Originating Department Public Works <br /> Standard Consultant Consent Contact Person r, Ryan Sass,P.E. <br /> Agreement with TranTech Action Phone Number 425-257-8942 <br /> Engineering, LLC, for the First Reading FOR AGENDA OF Sept. 21, 2011 <br /> Broadway Bridge Replacement Second Reading <br /> Project design services Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head VIM <br /> CAA �L <br /> Council President <br /> Location Preceding Action Attachments - Department(s)Approval <br /> Broadway Bridge over 12/23/10 Approved Supplemental Agreement Legal <br /> BNSF RR tracks Local Agency Standard Number 1 with exhibits <br /> Consultant Agreement <br /> Amount Budgeted $2,649,280.00 <br /> Expenditure Required $1,444,116.00 Account Number(s): PW3395 <br /> Budget Remaining $1,205,164.00 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> Because of the technical and engineering requirements to accomplish the design of the Broadway Bridge <br /> Replacement Project the City needs to utilize the services of a consulting firm. TranTech Engineering, LLC, <br /> was selected through a qualifications based selection process to accomplish this design effort. <br /> This supplemental agreement is the second phase of the design for the Broadway Bridge Replacement <br /> Project,which should result in a fully engineered project with completed plans and specifications. <br /> Subsequent supplements,for the construction phase, will be brought to City Council as needed. <br /> The funding for this Agreement is: <br /> STPD-2715(009) -Federal $1,444,116.00 <br /> RECOMMENDATION(Exact action requested of Council): <br /> Authorize the Mayor to sign Supplemental Agreement Number 1 to the Local Agency Standard Consultant <br /> Agreement with TranTech Engineering, LLC,for the Broadway Bridge Replacement Project design services. <br /> 31 <br />