Laserfiche WebLink
• <br /> Amok 7 <br /> V7IgiWashington State <br /> Department of Transportation <br /> Supplemental � reeme t Organization and Address <br /> TranTech Engineering,LLC <br /> Number 1 12011 -NE 1st Street,Suite 305 <br /> Bellevue,WA 98005 <br /> Original Agreement Number <br /> PW3395 Phone: 425-453-5545 <br /> Project Number Execution Date Completion Date <br /> 12/23/2010 12/30/2012 <br /> Project Title New Maximum Amount Payable <br /> Broadway Bridge Replacement Project $ 1,444,116.00 <br /> Description of Work <br /> Supplement Number 1 will advance the project to final design, construction documents,and bid support services. <br /> The Local Agency of City of everett <br /> desires to supplement the agreement entered into with TranTech Engineering,LLC <br /> and executed on 12/23/2010 and identified as Agreement No. PW3395 <br /> All provisions in the basic agreement remain in effect except as expressly modified by this supplement. <br /> The changes to the agreement are described as follows: <br /> Section 1, SCOPE OF WORK, is hereby changed to read: <br /> See tt2c.hed Rxhibit A Scope of Work-Supplement I <br /> it <br /> Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for <br /> completion of the work to read: 12/10/7012 <br /> ll! <br /> Section V, PAYMENT, shall be amended as follows: <br /> See attached Pxhihit B;Payment-Supplement 1 <br /> as set forth in the attached Exhibit A, and by this reference made a part of this supplement. <br /> If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces <br /> below and return to this office for final action. <br /> Sy: Tran ec Engineering T,I C By: City of F.verett <br /> Consuita t ignature Approving Authority Signature <br /> DOT Form 140-063 EF Date <br /> Revised 9/2005 <br /> 32 <br />