My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/09/21 Council Agenda Packet
>
Council Agenda Packets
>
2011
>
2011/09/21 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2017 10:23:40 AM
Creation date
5/5/2017 10:23:07 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/21/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> TASK 7 CONSTRUCTABILITY &ESTIMATION: <br /> This Task will be performed by TranTech's subconsultant Ott Construction Consultants (Ott)to <br /> provide public constructability and construction estimation services. <br /> The Task includes the following activities: <br /> 1. 60%PS&E Package <br /> a. Attend 3 meetings in Everett <br /> b. 60%Estimate: Update Bid Item list and provide a updated Cost Estimate based <br /> upon the 60% concept. <br /> c. 60%Project Schedule: Update the Project schedule using Bar Chart or Microsoft <br /> Project utilizing any and all constraints <br /> d. 60%Document Reviews: Review the 60%Plans and Specifications for <br /> constructability and consistency. <br /> e. Support/develop milestone dates or durations for construction stages with <br /> associated liquidated damages and/or incentives <br /> Deliverables: <br /> • Revise Bid Item list for proposal as needed <br /> • Update Project Estimate based upon 60% concept <br /> • Project CPM Schedule based upon 60% concept <br /> • Comments from the 60%Plan and specification review <br /> 2. 90%PS&E Package <br /> a. Attend 2 meetings in Everett <br /> b. 90%Estimate: Update Bid Item list and update a Cost Estimate based upon the <br /> 90% concept. <br /> c. 90%Project Schedule:Update Project schedule using Microsoft Project utilizing <br /> any and all constraints <br /> d. 90%Document Reviews: Review the 90%Plans and Specifications for <br /> constructability and consistency and participate in resolution of all comments. <br /> e. Update milestone dates or durations for construction stages with associated <br /> liquidated damages and/or incentives <br /> • <br /> Deliverables: • <br /> • Revise Bid Item list for proposal as needed <br /> • Project Estimate based upon 90% concept <br /> • Project CPM Schedule based upon 90% concept <br /> • Comments from the 90%Plan and specification review <br /> 3. Bid Ready PS&E Package <br /> 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.