Laserfiche WebLink
7 <br /> a. Attend 2 meetings in Everett <br /> b. Estimate:Update Bid Item list and provide an updated Cost Estimate based upon <br /> the Final Documents. <br /> c. Project Schedule: Update Project schedule using Microsoft Project utilizing any <br /> and all constraints <br /> d. Finalize milestone dates or durations for construction stages with associated <br /> liquidated damages and/or incentives <br /> Deliverables: <br /> • Revise Bid Item list for proposal as needed <br /> • Project Estimate <br /> • Project CPM Schedule <br /> • <br /> 43 <br />