Laserfiche WebLink
EXHIBIT A-3 1 2 <br /> SCOPE OF WORK <br /> • Task 06—Pipeline Condition Assessment(no new work) <br /> • Task 07—Design <br /> • Task 08—Design Report <br /> • Task 09—Construction Plan Drawings <br /> • Task 10—Technical Specifications <br /> • Task 11 —Construction Cost Estimates <br /> • Task 12—Construction Schedule <br /> • Task 13 —Project Manual <br /> • Task 14—Bidding Support(no new work—updated rates only) <br /> • Task 15—Permit Support <br /> • Task 16—Meetings <br /> • Task 17—Overhead Structure, Cost Estimates, Piperamming(no new work) <br /> • Task 18—3-D Rendering(no new work) <br /> • Task 19—Open Cut Feasibility(no new work) <br /> • Task 20—DNR Plat Lease Survey&Additional Geotech. Drilling) (no new work) <br /> • Task 21 —Shop Drawing Review&RFI's <br /> • Task 22—Construction Site Visits <br /> • Task 23—Record Drawings <br /> • Task 24—Undefined Services#1 (To be determined,if needed) <br /> Task 01—Project Management <br /> Amendment 3 will cover the period from September 2011 to December 2012. Project activities <br /> will be coordinated and directed with the goals of completing all work within budget, schedule <br /> and City"objectives and expectations. Coordination and liaison with the City will be on a regular <br /> basis to ensure that these objectives are met. <br /> Progress,schedule and budget will be monitored weekly. Invoices will be generated every four <br /> weeks. Monthly progress reports will be completed as cover letters for invoices. They will <br /> summarize task progress, identify tasks for next month and show used and available budgets. <br /> Potential out-of-scope items will be addressed after being reviewed for their viability and impact <br /> to the project. <br /> URS will be responsible for the quality of all work and will ensure that in-house quality control <br /> and technical reviews are conducted for all work-in-progress and deliverables prior to submittal <br /> to the City for comment and review. The in-house review will be conducted and documented for <br /> all submittals. <br /> Task 02—Archaeological Investigation <br /> No additional work is anticipated under this task. <br /> Task 03—Geotechnical Investigation <br /> • <br /> No additional work is anticipated under this task. <br /> SARHeftiVProjects\3251 Lines Pilchuck\Consultant_contrac nendment3\Pilchuck Open Cut Design Scope 09-27-11-rev2.docxPage 2 of 7 <br />