My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/10/19 Council Agenda Packet
>
Council Agenda Packets
>
2011
>
2011/10/19 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2017 11:18:25 AM
Creation date
5/5/2017 11:18:02 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/19/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
} <br /> EXHIBIT A-3 12 <br /> SCOPE OF WORK <br /> Revised engineers cost estimates and construction schedule will be presented in the final design <br /> report. <br /> For the 100% design submittal,one bound and one unbound camera-ready copy of the report will <br /> be submitted along with electronic version in Word and PDF format. <br /> Task 09—Construction Plan Drawings ' <br /> URS will prepare full size 24-inch by 36-inch CADD construction plan drawings for Snohomish <br /> County grading permits and for 100%design. The drawings will be produced in AutoCAD 2010 <br /> and will be prepared in accordance with the City Engineering Services Department drafting <br /> standards,title block layout and other requirements.URS anticipated the following sheets: <br /> 1) Title sheet with location and vicinity maps, index,legend and notes <br /> 2) City's standard symbols and abbreviations sheet <br /> 3) Site plan, 1'bSC, access plan and general notes(includes base map from Task 05) <br /> 4) Erosion and sediment control details <br /> 5) Subsurface profile(prepared under Task 03) <br /> 6) Survey control and layout <br /> 7) Trenched pipeline plan and profile <br /> 8) Excavation plan <br /> 9) Trenching details <br /> 10)Dewatering plan <br /> 11)Dewatering details <br /> 12)Dechlorination vault and water service details <br /> 13)Pipeline details <br /> 14)Pipeline details <br /> 15)Thrust control plan <br /> 16)Electrical conduit plan <br /> Three drawings(excavation plan,thrust control, and electrical conduit plan)were not needed. <br /> However,seven additional drawings(for a total of 20 drawings)were determined to be needed <br /> for the 95%design,grading permit, and 100%design submittal,including: <br /> • A second dewatering/river diversion plan; <br /> • River diversion profile sheet; <br /> • Dechlorination pipe profile sheet; <br /> • Dechlorination vault detail sheet; <br /> • Site restoration plan <br /> • Planting details <br /> • Alternate cover page that complies with the Snohomish County grading permit standards. <br /> • This includes cut/fill quantities,legal property description,and other prescribed <br /> information. <br /> Between 60%and 95%,the City's title block was revised. This was incorporated in all drawing <br /> sheets for the grading permit submittal. <br /> One full size and one half size camera-ready set of Construction Plan Drawings will be provided <br /> to the City along with electronic AutoCAD files. Drawing files shall be in DWG and DXF <br /> format. <br /> S:\RHefti\zProjects\3251 Lines Pilchuck\Consultant_contrac endment3\Pilchuck Open.Cut Design Scope 09-27-11-rev2.docxPage 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.