Laserfiche WebLink
12 <br /> EXHIBIT A-3 <br /> SCOPE OF WORK <br /> Task 19-Open Cut Feasibility <br /> No additional work is proposed under this task. <br /> Task 20—DNR Plat Survey and Additional Geotechnical Investigation' <br /> Exhibit D includes written correspondence for additional work performed in 2010 for the Aquatic <br /> Plat Lease Survey and the Geotechnical Boring in the gravel bar near the proposed crossing. <br /> Task 21 —Shop Drawing Review and Requests for Information <br /> Shop drawings for the new steel pipe and appurtenances will be conducted. <br /> Task 22—Construction Site Visits <br /> Two construction site visits are assumed to be needed for the pipe installation and two site visits <br /> are assumed to be needed for in-water work within the Pilchuck River. <br /> • <br /> Task 23—Undefined Services#1 <br /> As it is difficult to accurately predict all issues that may arise during the design,Task 24 is. <br /> included to provide a contingency fund for unanticipated and unidentified work.It is specifically. <br /> intended to allow payment to URS under this contract for scope changes that the City determines <br /> to be necessary. Funds for this task will not be used without prior written approval from the City. <br /> • <br /> S:\RHefi\zProjects\3251_Line5_Pilchuck\Consultant_contract62endment3\Pilchuck Open Cut Design Scope 09-27-11-rev2.docxPage 7 of 7 <br />