Laserfiche WebLink
Run Date: 9/20/2011 City of Everett-Public Works Department Cutoff Date: 9/2/2011 <br /> Time: 2:36 PM Contract Estimate Voucher <br /> For Work Order#3333 Contractor: TRI STATE CONSTRUCTION <br /> Project: 254 Estimate#11 PO BOX 3686 <br /> BELLEVUE,WA 98009-3686 <br /> REPLACEMENT OF WATER <br /> TRANSMISSION LINE#2,PHASE 8B <br /> WO 3333 BID:$2,593,267.88 <br /> TOTAL BID: $2,593,267.88 <br /> — Total Amt Previous Amt Present Amt FINAL <br /> 1.7 <br /> Contract Totals to Date $2,593,267.88 $2,578,117.81 $15,150.07 <br /> Retained Amounts $129,663.38 $128,905.88 $757.50 <br /> State Tax Amounts $223,021.03 $221,718.12 $1,302.91 <br /> Amounts Paid $2,686,625.53 $2,670,930.05 • <br /> Amount to be Paid This Estimate $15,695.48 <br /> 0)., <br /> Chocked B\? /L---- Date / /70/ I <br /> Recommended By � c.�tu / Date <br /> Public Works Director /V�( /�A 1 1 Date 41&) 1 <br /> RECORD DRAWING CHECKOFF <br /> Inspector: Date:_ <br /> Contractor: Date: <br /> Work Order Number: 3333 <br />