My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/11/02 Council Agenda Packet
>
Council Agenda Packets
>
2011
>
2011/11/02 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2017 11:37:02 AM
Creation date
5/5/2017 11:36:34 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/2/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Run Date: 9/20/2011 City of Everett-Public Works Department Cutoff Date: 9/2/2011 <br /> Time: 2:36 PM Contract Estimate Voucher <br /> For Work Order#3333 Contractor: TRI STATE CONSTRUCTION <br /> Project: 254 Estimate#11 PO BOX 3686 <br /> BELLEVUE,WA 98009-3686 <br /> REPLACEMENT OF WATER <br /> TRANSMISSION LINE#2,PHASE 8B <br /> WO 3333 BID:$2,593,267.88 <br /> TOTAL BID: $2,593,267.88 <br /> — Total Amt Previous Amt Present Amt FINAL <br /> 1.7 <br /> Contract Totals to Date $2,593,267.88 $2,578,117.81 $15,150.07 <br /> Retained Amounts $129,663.38 $128,905.88 $757.50 <br /> State Tax Amounts $223,021.03 $221,718.12 $1,302.91 <br /> Amounts Paid $2,686,625.53 $2,670,930.05 • <br /> Amount to be Paid This Estimate $15,695.48 <br /> 0)., <br /> Chocked B\? /L---- Date / /70/ I <br /> Recommended By � c.�tu / Date <br /> Public Works Director /V�( /�A 1 1 Date 41&) 1 <br /> RECORD DRAWING CHECKOFF <br /> Inspector: Date:_ <br /> Contractor: Date: <br /> Work Order Number: 3333 <br />
The URL can be used to link to this page
Your browser does not support the video tag.