My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/11/23 Council Agenda Packet
>
Council Agenda Packets
>
2011
>
2011/11/23 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2017 8:13:57 AM
Creation date
5/8/2017 8:13:41 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/23/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 Exhibit A to the Professional Services Agreement <br /> between The City of Everett and The Blueline Group,LLC for the <br /> Water"L" Improvements- Hewitt Ave(WO#UP3462) <br /> dated October 28,2011 <br /> Task 009 - CONSTRUCTION SUPPORT <br /> Blueline will provide construction administration services in a limited role as needed during the <br /> construction period, including: <br /> • Prepare for and attend the pre-construction conference. <br /> • Review requests for information (RFIs) provided by the City and coordinate responses to said <br /> RFIs with the City. <br /> • Review material submittals provided by the City and make recommendations for compliance <br /> with contract documents. <br /> • General consultation and coordination on an as-needed basis. Address construction <br /> questions as they arise. <br /> • Participate in up to three site visits to monitor construction progress. <br /> • Prepare record drawings in AutoCad based on City-provided construction redlines. <br /> Assumptions: This proposal does not include Construction Staking or Inspection Services <br /> but a separate fee proposal can be provided upon request. <br /> This proposal does not include pay estimate preparation or review, punch list <br /> assistance, or attending construction meetings but a separate fee proposal <br /> can be provided upon request. <br /> Deliverables: RFI responses (if necessary). <br /> Reviewed submittals in format requested by the City. <br /> Final Record Drawings (Hard copy of signed, stamped, and "camera-ready" <br /> sets - 1-22"x34"). <br /> Final Record Drawings (PDFs and CAD files on CD; Return hard copy of City- <br /> provided construction redlines). <br /> Task 010 - UNASSIGNED SERVICES RESERVE <br /> This task provides for unanticipated services deemed to be necessary during the course of the <br /> Project that are not specifically identified in the scope of work tasks defined above. Any additional <br /> work or funds under this item are not to be used unless explicitly authorized by the City. <br /> 4g - <br />
The URL can be used to link to this page
Your browser does not support the video tag.