My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/11/23 Council Agenda Packet
>
Council Agenda Packets
>
2011
>
2011/11/23 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2017 8:13:57 AM
Creation date
5/8/2017 8:13:41 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/23/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Exhibit A to the Professional Services Agreement 7 <br /> between The City of Everett and The Blueline Group,LLC for the <br /> Water"L" Improvements- Hewitt Ave(WO#UP3462) <br /> dated October 28,2011. <br /> GENERAL ASSUMPTIONS&NOTES <br /> • Scope and fees outlined above are based on the following information: <br /> o Scoping Meeting with the City held on 10/6/11. <br /> o City's GIS drawing file for the Hewitt area provided 10/6/11. <br /> o City's CAD Standards and templates provided 10/6/11. <br /> • City will provide the following: <br /> o Record drawings for City utilities(water, sewer, and storm drainage) within the project <br /> area. <br /> o Sample plans and specifications (hard copy) from a recent water main replacement <br /> project for reference. <br /> o Sample specifications (Word files) for all Divisions and Appendices from a recent <br /> water main replacement project. <br /> o Standard Details(CAD and PDF) necessary for the project. <br /> • Project stops/starts and significant changes to the attached Project Schedule may result in <br /> changes to the fees provided above and a separate fee proposal will be provided. <br /> • Public Involvement(open house, mailings, etc.) is not included in this proposal. <br /> • Agency fees(if any) are not included as part of the fees outlined above. <br /> • Offsite easements(if required)will be the responsibility of the Client. <br /> • The fees stated above do not include reimbursable expenses such as large format copies <br /> (larger than letter/legal size), mileage, and plots. These items will be billed under a separate <br /> task called Expenses. <br /> • Current hourly rates for The Blueline Group are provided on the attached Exhibit B. <br /> • These fees stated above are valid if accepted within 30 days of the date of the proposal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.