My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/11/30 Council Agenda Packet
>
Council Agenda Packets
>
2011
>
2011/11/30 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2017 8:39:47 AM
Creation date
5/8/2017 8:39:01 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/30/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17 <br /> Two draft copies of the Engineering Report,Plans Specifications, and Engineer's <br /> Estimates of Costs shall be provided to the Owner for review at the 35 percent and <br /> 90 percent completion stages. Two copies of the Engineering Report and Plans, <br /> Specifications, and Engineer's Estimate of costs will be provided to the reviewing <br /> • regulatory agency. <br /> BUDGET <br /> The maximum amount payable to the Engineer for completion of all work associated <br /> with this Project for the Engineering services based on the alternative for <br /> stabilizing/plugging and abandoning#1 Line Tunnel,including contingencies, salaries, <br /> overhead, direct non-salary costs and net fee shall be$40,930. This amount shall not be <br /> exceeded without prior written authorization of the Owner. <br /> However, should the Owner choose to pursue an alternative to rehabilitate the#1 Line <br /> Tunnel for some future hydraulic use,we will request an increase in engineering costs <br /> and fees. <br /> • <br /> • <br /> • <br /> 154 <br />
The URL can be used to link to this page
Your browser does not support the video tag.