17 <br /> b. Two meetings for Design development <br /> 1. 35 percent plan.review <br /> 2. 90 percent plan review <br /> Task 6—Quality Assurance/Quality Control(QA/QC) Reviews <br /> This work will include in-house quality assurance and quality control(QA/QC)reviews <br /> of all doenments in order to address dam safety standards, constructability issues,and <br /> other pertinent and relevant issues that may affect the project work. <br /> a. Perform a quality assurance and quality control (QA/QC)review of all <br /> documents in order to address those relevant issues that may affect the project. <br /> b. One QA/QC Review of the Engineering Report <br /> c. Two QA/QC Reviews for the Design Development work at 35 percent and 90 <br /> percent completion levels. <br /> SCHEDULE <br /> The services described herein for the work to stabilize/plug and abandon#1 Line Tunnel <br /> shall be completed as follows: <br /> Notice to Proceed issued by Owner: December 20,2011 <br /> On-site Tnspection and data gathering: January 27,2011 <br /> Receipt of information to be provided by Owner: February 1, 2011 <br /> Draft Engineering Report: Februaryr22,2011 <br /> Final Engineering Report: March 19,2011 <br /> Submittal to Dam Safety Agency: March 26,2011 <br /> Response from Dam Safety Agency May 1,2011 <br /> 35% QA/QC review complete: ' June 16, 2012 <br /> 90%QA/QC review complete: July 16,2012 <br /> Design Complete: August 1,2012 <br /> DELIVERABLES <br /> Three fmal hard copies of the Engineering Report and one set of reproducible set <br /> construction drawings and specification,two full(24" x 36") size copies of the <br /> construction drawings and specifications, and two electronic copies of the construction <br /> plans and specifications. <br /> 153 <br />