Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 1 1 <br /> • PROJECT TITLE: <br /> Amendment No. 4 to the Briefing COUNCIL BILL# <br /> Professional Services Proposed Action Originating Department Public Works <br /> Agreement with GHD for the Consent Contact Person Heather Griffin <br /> Shore Avenue Stormwater Action Phone Number (425)257-7206 <br /> Outfall Improvement Project First Reading FOR AGENDA OF Dec. 28,2011 <br /> Second Reading <br /> Third Reading Initialed by: <br /> Public Hearing Department Head <br /> Budget Advisory CAA sin <br /> Council President <br /> *AM <br /> Location Preceding Action Attachments Department(s) Approval <br /> Shore Avenue 12/20/2006 Professional Amendment No. 4 Public Works <br /> Services Agreement <br /> 1/26/2011 Amendment <br /> No. 3 <br /> Amount Budgeted $650,000 <br /> Expenditure Required $208,100 Account Number(s):UP 3118 <br /> Budget Remaining $330,946 <br /> Additional Required <br /> DETAILED SUMMARY STATEMENT: <br /> City surface water along the 3200 block of Shore Avenue collects into a temporary above-ground pipe. This <br /> pipe drops over 100 feet down the steep slope to a ditch at the BNSF railroad tracks, and flows in the BNSF <br /> ditch cross under the tracks in a culvert. The water then is discharged into Possession Sound. This <br /> temporary above-ground pipe was installed 13 years ago to address erosion problems on the hillside above <br /> the BNSF railroad tracks. The City entered into a Professional Services Agreement with GHD to evaluate <br /> and design a permanent facility that utilizes an existing underground sewer pipeline for conveying surface <br /> water down the hillside. <br /> GHD has produced predesign plans and alternatives for consideration by the City and BNSF. The <br /> amendment provides for consideration of additional alternatives and predesign of a newly selected <br /> alternative for an additional$208,100. <br /> RECOMMENDATION: <br /> Authorize the Mayor to sign Amendment No. 4 to the Professional Services Agreement with GHD for the <br /> Shore Avenue Stormwater Outfall Improvement Project for an additional$208,100. <br /> 61 <br />