My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/12/28 Council Agenda Packet
>
Council Agenda Packets
>
2011
>
2011/12/28 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2017 9:24:24 AM
Creation date
5/8/2017 9:23:45 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/28/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Polo <br /> Subconsultant Scope of Work <br /> Survey: <br /> Perform a topographic survey of the project area and prepare a basemap to City of Everett standards. <br /> Deliverables: <br /> • Survey basemap <br /> • Survey data binders <br /> Utility Potholing: <br /> Perform utility potholing to determine the size, material, and depth of existing utilities at locations to be <br /> determined by GHD and approved by the City. <br /> Deliverable: <br /> • Table documenting results of utility potholing results <br /> Geotechnical: <br /> Review geologic maps for the project vicinity and perform a reconnaissance of the alignment. Complete a <br /> subsurface exploration of the alignment consisting of two portable borings in the ravine and eight truck <br /> borings along Shore Avenue and at Edgewater Park. Five borings will include the installation of piezometers <br /> to monitor groundwater conditions. Complete laboratory testing on soil samples obtained from the <br /> subsurface explorations, including moisture content determinations and grain size analyses. Complete <br /> geotechnical analyses of the soil and groundwater conditions relative to design and construction <br /> considerations. Prepare a geotechnical report summarizing the findings of the geotechnical investigation. <br /> Deliverable: <br /> • Geotechnical report <br /> • <br /> Environmental: <br /> Complete a wetland and stream delineation of the project alignment. Perform a permitting assessment of <br /> alternative design approaches developed during the preliminary design phase, including meetings with <br /> representatives of the City of Everett planning department,Washington Department of Fish and Wildlife, and <br /> Army Corps of Engineers. Assist with developing cost estimates for permitting and mitigation of design <br /> alternatives. Prepare a memorandum summarizing the permitting assessment,and a separate wetland and <br /> stream delineation report. <br /> Deliverables: <br /> • Wetland and Stream Delineation Report <br /> • Permitting technical memorandum <br /> Note: The preliminary engineering phase scope and budget is based on Alternative Al as described in the <br /> October 2011 Shore Avenue Storm water Improvements—Edgewater Creek Feasibility Analysis, prepared by <br /> GHD Inc.The scope of work and budgets for preliminary engineering tasks will be refined upon City <br /> selection of a preferred alternative. <br /> 86/11218 Shore Avenue Stormwater Improvements 2 <br /> Amendment 4 Scope of Work <br /> 64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.