My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011/12/28 Council Agenda Packet
>
Council Agenda Packets
>
2011
>
2011/12/28 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2017 9:24:24 AM
Creation date
5/8/2017 9:23:45 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/28/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 1 <br /> Shore Avenue Stormwater Outfall Improvements <br /> Contract Amendment#4 <br /> Scope of Work <br /> . December 8,2011 <br /> GHD will perform the following tasks related to completion of the Edgewater Creek Outfall Feasibility <br /> Analysis and preliminary and final design of the preferred alternative. <br /> Phase 1—Feasibility Analysis <br /> Edgewater Creek Outfall Feasibility Analysis Completion: Complete analysis of Sub-alternatives R4 and <br /> SA2(surface pipe through Edgewater Ravine and shallower Shore Ave storm drain). Complete additional <br /> analyses for Alt. A2 second phase (new conveyance pipe for Sound Ave sub-basin). Complete Alt.A3 <br /> (Powder Mill Gulch Outfall). Update the October 2011 Edgewater Creek Outfall Feasibility Analysis to <br /> document the findings of the above-described additional tasks. Modifications to the report would include <br /> updates to the text,figures,cost estimates, and alternatives evaluation spreadsheet to document the <br /> additional alternative analyses. <br /> Deliverable: Final Edgewater Creek Outfall Feasibility Analysis Report <br /> Feasibility Coordination Meetings: Attend meetings with City of Everett and BNSF Railway as requested <br /> to support selection of a preferred alternative. <br /> Phase 2—Preliminary Engineerinq <br /> The following tasks will be performed when directed by the City of Everett,following completion of Phase 1. <br /> Perform topographic survey, sub-surface utility investigation, geotechnical investigations,wetland/stream <br /> delineation, and permitting assessment(see Subconsultant scope of work). Perform alternatives analysis for <br /> final alignment selection. Perform hydrologic and hydraulic sizing calculations. Prepare 30%plans and cost <br /> estimate. Perform preliminary coordination with BNSF, environmental permitting agencies, and affected <br /> utility purveyors. Prepare a draft design report. <br /> Deliverables: <br /> • Wetland delineation report <br /> • Topographic survey <br /> • Geotechnical report <br /> • Permitting technical memo <br /> • Draft design report <br /> • 30% plans <br /> • 30%cost estimate <br /> 63 <br />
The URL can be used to link to this page
Your browser does not support the video tag.