|
2
<br /> ARTICLE II—BNSF OBLIGATIONS
<br /> In consideration of the covenants of Agency set forth herein and the faithful performance thereof, BNSF
<br /> agrees as follows:
<br /> •
<br /> 1. In consideration of the faithful performance of the Agency's covenants contained herein, BNSF
<br /> hereby grants to Agency, its successors and assigns, upon and subject to the terms and conditions set
<br /> forth in this Agreement, permission and license to enter upon and use the portion of BNSF's right-of-way
<br /> as is necessary to reconstruct and thereafter maintain, the Crossing as described further on Exhibit A,
<br /> excepting and reserving BNSF's rights, and the rights of any others who have obtained, or may obtain,
<br /> permission or authority from BNSF, to do the following:
<br /> (a) Operate, maintain, renew and/or relocate any and all existing railroad track or tracks, wires,
<br /> pipelines and other facilities of like character upon, over or under the surface of said right-of-
<br /> way;
<br /> (b) Construct, operate, maintain, renew and/or relocate upon said right-of-way, without limitation,
<br /> such facilities as the BNSF may from time to time deem appropriate;
<br /> (c) Otherwise use or operate the right-of-way as BNSF may from time to time deem appropriate.
<br /> This right is given by BNSF without warranty of title of any kind, expressed or implied, and no covenant
<br /> on warranty of title shall be implied from the use of any word or words herein contained. In the event
<br /> Agency is evicted by anyone owning, or claiming title to or any interest in said right-of-way, BNSF will not
<br /> be liable to Agency for any damages, losses or any expenses of any nature whatsoever. The granting of
<br /> similar rights to others, subsequent to the date of this Agreement, will not impair or interfere with the rights
<br /> granted to Agency herein.
<br /> Provided Agency is in compliance with the terms and conditions of this Agreement, BNSF will
<br /> grant to Agency, its successors and assigns, an easement (hereinafter called, the "Easement") to enter
<br /> upon and use that portion of BNSF's right-of-way as is necessary to use and maintain the Crossing,
<br /> substantially in the form of Exhibit B attached to this Agreement. Agency must pay BNSF the sum of
<br /> Ninety Two Thousand Six Hundred Thirty Three and No/100 Dollars ($92,633.00) as compensation for
<br /> the Easement within thirty (30) days of issuing a Notice to Proceed pursuant to Article III, Section 8 of this
<br /> Agreement. If Agency fails to pay BNSF within the thirty day time period set forth in the preceding
<br /> sentence, BNSF may stop construction of the Project until full_payment is received by BNSF.
<br /> 2. BNSF will furnish all labor, materials, tools, and equipment for railroad work required for the
<br /> construction of the Project, such railroad work and the estimated cost thereof being as shown on Exhibit
<br /> D attached hereto and made a part hereof. In the event construction on the Project has not commenced
<br /> within six (6) months following the Effective Date, BNSF may, in its sole.and absolute discretion, revise
<br /> the cost estimates set forth in said Exhibit D. In such event, the revised cost estimates will become a part
<br /> of this Agreement as though originally set forth herein. Any item of work incidental to the items listed on
<br /> Exhibit D not specifically mentioned therein may be included as a part of this Agreement upon written
<br /> approval of Agency, which approval will not be unreasonably withheld. Construction of the Project must
<br /> include the following railroad work by BNSF:
<br /> (a) Procurement of materials, equipment and supplies necessary for the railroad work;
<br /> (b) Preliminary engineering, design, and contract preparation;
<br /> (c) Furnishing of flagging services during construction of the Project as required and set forth in
<br /> further detail on Exhibit C, attached to this Agreement and made a part hereof;
<br /> (d) Furnishing engineering and inspection as required in connection with the construction of the
<br /> Project;
<br /> -2-
<br /> 5
<br />
|