Laserfiche WebLink
2 GRADE CROSSING CONSTRUCTION AND MAINTENANCE AGREEMENT <br /> Pacific Avenue/Eclipse Mill Road Crossing <br /> U.S. D.O.T. No. 084605T <br /> Railroad Line Segment 407 <br /> Railroad Milepost 0.65 <br /> This Agreement ("Agreement"), is executed to be effective as of this day of <br /> 20__ ("Effective Date"), by and between BNSF RAILWAY COMPANY, a Delaware corporation <br /> ("BNSF"), and the CITY OF EVERETT, a political subdivision of the State of Washington ("Agency"). <br /> RECITALS: <br /> WHEREAS, BNSF owns and operates a line of railroad in and through the City of Everett, State of <br /> Washington; <br /> WHEREAS, in the interest of aiding vehicular travel and public safety, the Agency is undertaking a project <br /> to improve the existing Pacific Avenue/Eclipse Mill Road at-grade crossing, located at BNSF Line <br /> Segment 407 and Milepost 0.65., and designated by D.O.T. No. 084605T, by reconstructing and <br /> realigning the roadway and installing railroad crossing signals and activation equipment within the existing <br /> roadway easement across the BNSF right-of-way as indicated on the Exhibit A, attached hereto and <br /> incorporated herein; <br /> WHEREAS, the Agency desires to preempt the new highway traffic control signals with the grade <br /> crossing warning devices shown on Exhibit A; <br /> WHEREAS, BNSF agrees to allow the Agency to preempt the highway traffic control signals with the <br /> grade crossing warning devices indicated on Exhibit A; <br /> WHEREAS, the parties agree that BNSF will receive no ascertainable benefit from the installation of <br /> advance warning signs, pavement marking stop bars or crossing signal equipment (hereinafter <br /> collectively called, "Crossing Signal Equipment"); <br /> WHEREAS, the Agency is paying for the acquisition and installation of Crossing Signal Equipment at <br /> Pacific Avenue/Eclipse Mill Road; and <br /> WHEREAS, BNSF agrees to purchase and install, at Agency's sole expense, the Crossing Signal <br /> Equipment described in the scope of work herein, and upon the terms and conditions set forth below. <br /> NOW, THEREFORE, in consideration of the mutual covenants and agreements of the parties contained <br /> herein, the receipt and sufficiency of which are hereby acknowledged, the parties agree as follows: <br /> ARTICLE I—SCOPE OF WORK <br /> 1. ' The term "Project" as used herein includes any and all work related to the reconstruction of <br /> Pacific Avenue/Eclipse Mill Road by Agency and installation of Crossing Signal Equipment at U.S. D.O.T <br /> No. 084605T, (hereinafter referred to as the "Crossing") by BNSF, more particularly described on the <br /> Exhibit A, including, but not limited to, any and all changes to telephone, telegraph, signal and electrical <br /> lines and appurtenances, temporary and permanent track work, fencing, grading, alterations to or new <br /> construction of drainage facilities, preliminary and construction engineering and contract preparation. <br /> • <br /> Form 0118 Rev.09/21/06 <br /> 4. <br />