Laserfiche WebLink
lilll <br /> EV/ERETT <br /> A. Estimated Project Costs <br /> 1. Hewitt Ave. & Maple St. Intersection (Prog. 482) <br /> Preliminary Engineering (W.O. 2355) $ 1,500 <br /> Construction (W.O. 2356) 143.750 <br /> TOTAL $145,250 <br /> 2. Everett Ave. & Maple St. Improvements (Prog. 483) <br /> Preliminary Engineering (W.O. 2435) $ 10,000 <br /> Construction (W.O. 2447) 692.300 <br /> TOTAL $702,300 <br /> 3. SR-2/California & Walnut (Prog. 484) <br /> Construction (W.O. 2449) $189,750 <br /> TOTAL $189,750 <br /> 4. Right-of-Way (Prog. 485) <br /> Right-of-way (W.O. 2448) $ 50,000 <br /> TOTAL $ 50,000 <br /> 5. California & Walnut/Maple Improvements (Prog. 956) <br /> Preliminary Engineering (W.O. 2086) $ 35,050 <br /> Construction (W.O. 2156) 117,300 <br /> TOTAL $152,350 <br /> TOTAL PROJECT COSTS $1,239,650 <br /> B. Source of Funds <br /> 1. Hewitt Ave. & Maple St. Intersection (Prog.482) <br /> HES (Federal Aid) $107,100 <br /> 1/2 Cent Gas Tax 38,150 <br /> TOTAL $145,250 <br /> 2. Everett Ave. & Maple St. Improvements (Prog. 483) <br /> WSDOT (FAUS) $345,654 <br /> 1/2 Cent Gas Tax 356.646 <br /> TOTAL $702,300 <br /> 2 <br /> (1488) <br />