My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 1798-91
>
Ordinances
>
Ordinance 1798-91
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2017 11:32:29 AM
Creation date
5/9/2017 11:32:28 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
1798-91
Date
7/3/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
lilll <br /> EV/ERETT <br /> A. Estimated Project Costs <br /> 1. Hewitt Ave. & Maple St. Intersection (Prog. 482) <br /> Preliminary Engineering (W.O. 2355) $ 1,500 <br /> Construction (W.O. 2356) 143.750 <br /> TOTAL $145,250 <br /> 2. Everett Ave. & Maple St. Improvements (Prog. 483) <br /> Preliminary Engineering (W.O. 2435) $ 10,000 <br /> Construction (W.O. 2447) 692.300 <br /> TOTAL $702,300 <br /> 3. SR-2/California & Walnut (Prog. 484) <br /> Construction (W.O. 2449) $189,750 <br /> TOTAL $189,750 <br /> 4. Right-of-Way (Prog. 485) <br /> Right-of-way (W.O. 2448) $ 50,000 <br /> TOTAL $ 50,000 <br /> 5. California & Walnut/Maple Improvements (Prog. 956) <br /> Preliminary Engineering (W.O. 2086) $ 35,050 <br /> Construction (W.O. 2156) 117,300 <br /> TOTAL $152,350 <br /> TOTAL PROJECT COSTS $1,239,650 <br /> B. Source of Funds <br /> 1. Hewitt Ave. & Maple St. Intersection (Prog.482) <br /> HES (Federal Aid) $107,100 <br /> 1/2 Cent Gas Tax 38,150 <br /> TOTAL $145,250 <br /> 2. Everett Ave. & Maple St. Improvements (Prog. 483) <br /> WSDOT (FAUS) $345,654 <br /> 1/2 Cent Gas Tax 356.646 <br /> TOTAL $702,300 <br /> 2 <br /> (1488) <br />
The URL can be used to link to this page
Your browser does not support the video tag.