My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012/04/04 Council Agenda Packet
>
Council Agenda Packets
>
2012
>
2012/04/04 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2017 10:00:15 AM
Creation date
5/10/2017 9:58:18 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/4/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR PROPOSALS <br /> . , di f General Contractor/Construction Manager Services for <br /> " � Water Pollution Control Facility Expansion-Phase C <br /> TABLE OF CONTENTS <br /> 1.0 Introduction 1 <br /> 2.0 Project Description 4 <br /> 3.0 Schedule 8 <br /> 4.0 Scope of GC/CM Services 9 <br /> 5.0 Selection and Award Process 10 <br /> 6.0 Request for Information and Issuance of Addenda 13 <br /> 7.0 Proposal Submittal Requirements 14 <br /> 8.0 Contents of Proposal and Evaluation Criteria 16 <br /> 9.0 Reference Checks 29 <br /> 10.0 Interviews 29 <br /> 11.0 Final Proposals 30 <br /> 12.0 Final Selection 32 <br /> 13.0 Public Disclosure 33 <br /> 14.0 Debriefing and Protest Procedures 34 <br /> 15.0 Cancellation and Rejection of Proposals 35 <br /> Attachment A— Preliminary Preconstruction Work Activities <br /> Attachment B — Forms <br /> • Form 1 — Proposal Certification <br /> • Form 2 — Safety & Health Qualifications Statement <br /> Attachment C— Project Exhibits <br /> • Figure 1 —Vicinity/Location • Volumes 1 & 2 of 30% Plans <br /> Map <br /> • Figure 2 — Site Plan <br /> City of Everett Page i April 16, 2012 <br /> Water Pollution Control Facility Expansion -Phase C Table of Contents <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.