My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012/05/23 Council Agenda Packet
>
Council Agenda Packets
>
2012
>
2012/05/23 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2017 9:04:17 AM
Creation date
5/12/2017 9:03:41 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/23/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA HEM COVER SHEET 1 4 <br /> PROJECT TITLE: <br /> Amendment Five to the Briefing COUNCIL BILL# <br /> Professional Services Proposed Action Originating Department Parks <br /> Agreement with Nakano Consent Contact Person Paul Kaftan ski <br /> Associates for Design of the Action Phone Number 425-257-8335 <br /> Downtown Plaza at the Everett First Reading FOR AGENDA OF May 16,2012 <br /> Performing Arts Center Second Reading <br /> Third Reading Initialed by: <br /> Public Hearing Department Head <br /> CAA OF <br /> Council President i <br /> Location Preceding Action Attachments Department(s)Approval <br /> Everett Performing Arts Council approval of Amendment Five Admin,Legal <br /> Center—South Frontage Amendment Four, <br /> 4/27/11 <br /> Amount Budgeted $2,746,132.00 <br /> Expenditure Required 0 Account Number(s):Fund 354,Program 036 <br /> Budget Remaining $2,261,093.00 <br /> Additional Required 0 <br /> DETAILED SUMMARY STATEMENT: <br /> The Parks and Recreation Department has a Professional Services Agreement with Nakano Associates for <br /> downtown plaza design. Amendment One integrated project artist work and exterior lighting design into the <br /> construction documentation. Amendment Two was a no-cost contract time extension through December 31, <br /> 2011. Amendment Three included work required as a result of the restart of the plaza project after a one year <br /> suspension in design preparation.Amendment Four added necessary design services to complete alley <br /> configuration, construction administration on an as-needed basis, and a no cost time extension to May 31, <br /> 2012. <br /> With award of the plaza construction project on March 28,2012,Amendment Five is a no-cost time <br /> extension to November 30,2012, for construction administration on an as needed basis. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign Amendment Five to the Professional Services Agreement with Nakano <br /> Associates for Design of the Downtown Plaza at the Everett Performing Arts Center. <br /> 95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.