My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012/05/23 Council Agenda Packet
>
Council Agenda Packets
>
2012
>
2012/05/23 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2017 9:04:17 AM
Creation date
5/12/2017 9:03:41 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/23/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> AMENDMENT FIVE <br /> To <br /> PROFESSIONAL SERVICES AGREEMENT <br /> For <br /> DESIGN OF THE EVERETT PERFORMING ARTS CENTER <br /> DOWNTOWN PLAZA <br /> With <br /> NAKANO ASSOCIATES,LLC <br /> This AGREEMENT,entered into the day of May 2012,constitutes Amendment <br /> No. 5 to the "Agreement"between the City of Everett,"the City" and Nakano Associates, <br /> LLC herein after called the"Consultant,"entered into on the 8th day of October,2007 and <br /> amended(Amendment No. 1) on April 23,2008, (Amendment No 2) on June 24,2009, <br /> (Amendment No. 3) on September 23,2010,and(Amendment No. 4) on May 3,2011. <br /> WITNESSETH: <br /> WHEREAS, Section 8.0 of the Agreement provides for adjustment or modification of the <br /> Agreement by mutual consent of the CITY and the CONSULTANT; and <br /> WHEREAS,the CITY entered into a professional services agreement with the <br /> CONSULTANT to provide design services for the Everett Performing Arts Plaza for the <br /> Parks and Recreation Department; and <br /> WHEREAS,Amendment Number One to that professional services agreement was <br /> entered into to perform additional lighting and electrical design work with an additional <br /> fee; and <br /> -WI IEREAS,Amendment Number Two to that professional services agreement was <br /> entered into to establish a no-cost time extension to December 31,2011 to complete all <br /> professional services agreement tasks;arid <br /> WHEREAS,Amendment Number Three to that professional services agreement was <br /> entered into to coordinate and develop revisions to design and construction documents as <br /> a result of project re-initation with an additional fee; and <br /> WHEREAS,Amendment Number Four to that professional services agreement was <br /> entered into to complete the Former Key Bank Shell and Core project necessary design <br /> and construction document development services and provide construction administration <br /> services as necessary on an as-needed basis as determined by the city; and <br /> WHEREAS, completion of construction administration services will require a no-cost <br /> time extension to complete. <br /> • <br /> 96 <br />
The URL can be used to link to this page
Your browser does not support the video tag.