My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012/06/13 Council Agenda Packet
>
Council Agenda Packets
>
2012
>
2012/06/13 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2017 9:33:18 AM
Creation date
5/12/2017 9:32:57 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/13/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Deliverables <br /> ® Charter with principles for project cooperation. <br /> Subtask 3.4—Review GCICM's Project Management Plan <br /> ■ SAIC will review project management plan prepared by the GC/CM contractor that details <br /> how they will manage the efforts of the GC/CM team to ensure coordination of project <br /> participants during the preconstruction phase. <br /> City to Provide - <br /> ■ GC/CM's draft project management plan. <br /> Deliverables <br /> • Review comments on project management plan. <br /> Subtask 3.5—Project and Design Team Meetings <br /> • SAIC will attend up to six project and design team meetings with City staff, the City's <br /> Design Engineer and the.GC/CM contractor for each phase of the project, including design <br /> review meetings at 30, 60 and 90 percent design completion. <br /> City to Provide <br /> o Agenda and documents to be discussed at meetings. <br /> Deliverables <br /> • None <br /> Subtask 3.6—Review GC/CM Estimating Methodology Report <br /> • SAIC will review the draft estimating methodology report prepared by the GC/CM <br /> contractor that addresses the assumptions and approach that will be used in preparing <br /> construction cost estimates for the Project. <br /> City to Provide <br /> • GC/CM's draft estimating methodology report. <br /> Deliverables <br /> • Review comments. <br /> Subtask 3.7—Review Estimate Reconciliation <br /> • SAIC will review the results of the estimate reconciliation between the GC/CM <br /> contractor's estimate and Design Engineer's 60 percent estimate. <br /> City to Provide <br /> • Cost estimate and reconciliation. <br /> File: 001581 i 9651100046 March 28,2012 Page 12 of 19 <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.