My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012/06/13 Council Agenda Packet
>
Council Agenda Packets
>
2012
>
2012/06/13 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2017 9:33:18 AM
Creation date
5/12/2017 9:32:57 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/13/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> a Review comments on subcontracting plan. <br /> Subtask 3.11 —Review and Assist with Compliance for CPARB Reporting Requirements <br /> • As requested, SAIC will review and assist the City with CPARB reporting compliance. <br /> City to Provide <br /> ▪ City records and project documentation, as necessary. <br /> Deliverables <br /> o Review comments regarding CPARB reporting. <br /> Subtask 3.12-MACC Strategy Development <br /> • SAIC will assist in developing overall negotiation strategy,including identifying technical, <br /> cost and contract issues that will need to be resolved during MACC negotiations. <br /> . City to Provide <br /> • Direction on City policy and project budget for MACC negotiation strategy. <br /> Deliverables <br /> ■ Memorandum on MACC strategy. <br /> Subtask 3.13-MACC Development and Negotiation <br /> o SAIC will participate in up to two fonnal MACC negotiation meetings with the selected <br /> GC/CM contractor. <br /> City to Provide <br /> • Lead role in MACC negotiations. <br /> Deliverables <br /> • Memorandum summarizing MACC development and negotiations. <br /> Additional Services <br /> SAIC will assist the City by providing additional analyses and technical services as requested by <br /> the City. The following activities are representative, but not all inclusive of those that could be <br /> needed for the project. <br /> Subtask 3.14-Review Results of Value Engineering, Constructability andlor Risk Management <br /> • As requested, SAIC will review the results of value engineering, constructability and risk <br /> management issues, and advise on contractual and risk issues (as requested). <br /> • One meeting in Everett. <br /> File: 001581 19651100046 March 28,2012 Page 14 of 19 <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.