Laserfiche WebLink
City to Provide <br /> ® Results of value engineering, constructability and risk management. <br /> Deliverables <br /> ■ Review comments on results of value engineering, constructability and risk management. <br /> Subtask 3.15—Facilitate Resolution of Project Issues <br /> • As requested, SAIC will advise and facilitate resolution of project issues by providing <br /> independent review of costs, early construction, schedule, and other issues as requested. <br /> City to Provide <br /> • Identification of project issues requiring analysis. <br /> Deliverables <br /> ▪ Comments and/or recommendations on identified project issues. <br /> Subtask 3.16—Project Administration Assistance <br /> • As requested, SAIC will assist with project administration. Examples could include: <br /> — Review of the GC/CM's pay request for preconstruction services. Includes ensuring <br /> that only preconstruction services costs are paid. <br /> — Review of project status and identify issues affecting performance. <br /> — Providing strategic advice regarding potential issues and ongoing concerns. <br /> — Developing and maintaining GC/CM issues list. <br /> — Response to questions related to contract documents (e.g., preconstruction services <br /> contract, GC/CM contract). <br /> — Evaluating whether cost estimating line items are consistent with the cost allocation <br /> matrix. <br /> City to Provide <br /> ■ Requests for project administration assistance. <br /> Deliverables <br /> • Review comments and/or work products. <br /> Subtask 3.17—Review Baseline 30 Percent Cost Estimate <br /> • As requested, SAIC will review the cost estimate based on 30 percent design prepared by <br /> the GC/CM contractor with respect to discrepancies in cost categories, completeness, need <br /> for potential cost increases, and other factors. <br /> File: 001581 I 9651100046 March 28,2012 Page 15 of 19 <br /> 18 <br />