Laserfiche WebLink
1 1 <br /> V�; ., <br /> NOTICE OF COMPLETE APPLICATION <br /> and <br /> PLANNED ACTION DETERMINATION <br /> SEPA#10-009 <br /> Two -200,000 square foot Manufacturing Buildings <br /> December 12, 2011 <br /> DESCRIPTION OF PROPOSAL: The proposal includes a division of 140.66 acres into three lots. Lots 1 and 2 <br /> would each contain one building; Lot 3 would contain the existing ongoing Cemex mineral extraction and <br /> red i-mix activities. Proposed development includes construction of two 200,000 square foot manufacturing <br /> buildings on 25.41 acres with associated parking and utility improvements. Two open space tracts would be <br /> provided with a total of 5.23 acres (Tracts 996 and 997). <br /> PROPONENT: Cemex, CJ Ebert <br /> 2911% Hewitt Ave <br /> Everett,WA 98201 <br /> PROPONENT'S <br /> REPRESENTATIVE: Jack Molver, David Evans Assoc. <br /> 1620 W Marine View Dr#200 <br /> Everett,WA 98201 <br /> LOCATION: 6300 Glenwood Ave <br /> ZONING: M-1-Office and Industrial Park,with Planned Development Overlay <br /> GENERAL PLAN: 5.4-Office& Industrial Park <br /> Lead Agency: City of Everett Planning Department <br /> Contact Person:Dave Tyler Phone: (425)257-8731 <br /> The City of Everett Planning and Community Development Director has determined that: <br /> • The project is located within the boundaries of the Southwest Everett Subarea Plan_ <br /> • The zoning designation of the property upon which the project is proposed is consistent with those <br /> designations analyzed in the Southwest Everett/Paine Field Subarea Plan and EIS, December 1996. <br /> • The proposed use is consistent with the uses and intensities allowed in the City's development <br /> regulations and is listed as a use analyzed in the final EIS,Tables 3.1-1 and 3.1-2. <br /> • The project is a use that implements the Subarea Plan and the project's significant environmental <br /> impacts have been adequately addressed in the SW Everett/Paine Field.Subarea Plan EIS. <br /> • The project's significant adverse environmental impacts will be mitigated through the application of <br /> the mitigation decision document. These mitigation measures, along with other City requirements <br /> and conditions, constitute sufficient mitigation for the significant environmental impacts associated <br /> with the proposed project. <br /> • The proposed project must comply with all applicable local,state and federal regulations and <br /> development standards. <br /> • The proposed project is not an essential public facility. <br /> F� 2930 Wetmore, Suite 8-A,Everett, WA 98201-4044 W (425)257-8731, Fax(425)257-8742 <br /> 1 aZl <br />