Laserfiche WebLink
2Q <br /> CERTIFICATE OF COMPLETION <br /> Project: Portal 3 Modifications <br /> Contractor: Razz Construction,Inc. <br /> Work Order No. UP3192 <br /> The above mentioned project was constructed per the plans and specifications and to the <br /> • satisfaction of the Public Works Department. <br /> The Contractor physically completed the project,within the time allowed in the contract. <br /> It is recommended that the City accept this project as complete. <br /> Recommended by: <br /> .11 -7 <br /> —2_ <br /> Public '1. s �' - tor Dat <br /> Dave Davis <br /> Approved by: <br /> Mayor, City of Everett Date <br /> Ray Stephanson <br /> Attest: <br /> City Clerk • <br /> Sharon Marks <br /> APPROVED AS TO FORM <br /> By: <br /> Jim Iles, City Attorney <br /> Date <br /> 199 <br />