Laserfiche WebLink
2_0 • <br /> CITY OF EVERETT <br /> FINAL CONTRACT VOUCHER CERTIFICATION <br /> CONTRACTOR: Razz Construction, Inc. ADDRESS: 4055 Hammer Drive <br /> CITY: Bellingham WA 98226 DATE: June 26, 2012 <br /> PROJECT TITLE: Portal 3 Modifications WORK ORDER NO. UP3192 <br /> DATE WORK COMPLETE: July 5, 2012 FINAL AMOUNT: $890,092.59 <br /> CONTRACTOR'S CERTIFICATION <br /> I, the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work performed <br /> and.material furnished to the City of Everett, that the same or any part thereof has not been paid, and that I am <br /> authorized to sign for the claimant; that I have not rented or purchased any equipment or materials from any <br /> employee of the City; I further certify that the attached final estimate is a true and correct statement showing all the <br /> monies due me from the City of Everett under this contract; that I have carefully examined said final estimate and <br /> understand the same and that I •:.reby release the City of Everett from any and all claims of whatsoever nature which <br /> I may have, arising out of to- • rformance of said contract,which are not set forth in said estimate. <br /> X ,ottlittitiro <br /> \‘` s <br /> CONTRACTOR TITLE •ct••••—•-'64, <br /> .:0ENT 42.. <br /> 4?4/ • I.' <br /> Razz Construction, Inc. • <br /> • <br /> •/‘ <br /> = 20 = <br /> Subscribed and sworn to before 2.0A5 <br /> me this \04- day of 2 o *03), •tt- <br /> A)ivt_Vt.L.%.( 1 Notary Public <br /> in a for the State of as gton,residing at ( t,d1()-“ulev,..,4y1 . <br /> PUBLIC WORKS DEPAR ME T CERTIFICATION <br /> I Certify the attached final APPROVED Date: <br /> estimate to be based upon actual <br /> measurements and to be true and correct. <br /> xciX /10 kl <br /> Construction Manager Public Works Director <br /> Tom Fuchs Dave Davis <br /> INSTRUCTIONS <br /> The Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all subcontractor's <br /> agents and forwarded with the Final Contract Voucher Certification. <br /> Contractor's Claims, if any, must be included and the Contractor's Certification must be labeled indicating a claim <br /> attached. <br /> Revised 9/94 <br /> 1 98 <br />