Laserfiche WebLink
2 <br /> Exhibit A-1 <br /> Amendment No. 1 <br /> Detailed Design &Construction Support Services <br /> City of Everett <br /> SCOPE OF SERVICES <br /> SEWER "M" PROJECT, UP 3470 <br /> Sewer System Replacement and <br /> Capacity Improvements <br /> Jacobs Engineering Group <br /> July 2012 <br /> 1. PROJECT UNDERSTANDING <br /> The City of Everett contracted with Jacobs for planning, design, and construction assistance <br /> services to provide for construction of buried pipelines and street improvements in a 30-block <br /> area, or 112 acres, roughly between 10th and 19th Streets and between Grand and Rockefeller <br /> Avenues. The neighborhood is single family residential and within the NW Everett <br /> Neighborhood. <br /> As a result of planning efforts, the project within the study area was phased in two parts. This <br /> amendment consists of detailed design and construction support services for Alternative E-3 <br /> Phase 1, as defined in Fig 4-8 of the Technical Memorandum, Task 200—Sewer System <br /> Hydraulic Modeling Analysis, prepared by Jacobs in May 2012. This figure is included as <br /> Exhibit D-1 of this Amendment. The Project will generally consist of: • <br /> • Modifications to its existing combined sewer(CS) system to include: <br /> o Installation of up to approximately 6000 LF of storm water(SW) separation from <br /> the combined sewer(CS)conveyance system connecting to the City's existing <br /> CSO overflow pipeline in the vicinity of Grand Avenue and 15th Street. <br /> o installation of new regulator structure that would provide a means for diverting <br /> most storm water flows to treatment, with higher flows passing to the outfall. <br /> • Replacement of approximately 8,300 LF of aging sewers and 190 side sewers; and, <br /> • Replacement or restoration of streets (including asphalt pavement, curb & gutter, and <br /> sidewalk) and alley restoration, as needed. <br /> July 2012 r6.0 Page 1 of 19 Jacobs Engineering Group <br /> 11 <br />