Laserfiche WebLink
F3 <br />Assumptions <br />1. The wetland delineation will be performed when hydrologic conditions are readily <br />observable (i.e., not during the dry season). <br />2. The Wetland and Stream Delineation Report is limited to one review and revision cycle <br />each by the City. <br />Deliverables <br />1. Wetland and Stream Delineation Report (Draft and Final, PDF via email). <br />Task 500 — Surveying Services <br />Objective <br />To provide a survey and base map file for the design team use. This task will be completed by <br />a subconsultant, Perteet. Surveying will be provided in the final design phase. <br />HDR Services <br />1. None. <br />Subconsultant (Perteet) Services <br />1. None. <br />Client Responsibilities <br />1. Provide existing survey mapping of the area. <br />Assumptions <br />1. None <br />Deliverables <br />1. None. <br />Task 600 —Additional Services <br />Objective <br />1. Provide additional as -yet -defined services as requested by the City. <br />HDR Services <br />1. It is difficult to accurately anticipate all the issues that may arise during the development <br />of the project. This task establishes a_ contingency fund for unidentified and <br />unanticipated work. <br />2. This task is specifically designed to allow payment to HDR under this contract for <br />changes in the scope of work which the City determines to be necessary. The funds <br />included in this Task cannot be utilized without written approval from the City. <br />Ciiy of Evereii —'NF CF Div ersion Structure 0 26 Scope of Sei , ices <br />