My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/08/26 Council Agenda Packet
>
Council Agenda Packets
>
2015
>
2015/08/26 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 5:27:36 PM
Creation date
9/2/2015 3:43:45 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/26/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUJTCIL AGENDA ITEM COVER SHEET <br />PROJECT TITLE: <br />All Ordinance creating a <br />special improvement project <br />entitled, "City-wide Intersection <br />Signing," Fund 303, Program <br />105, to accumulate all costs for <br />the improvement <br />Briefing <br />Proposed Action <br />Consent <br />Action <br />First Reading <br />Second Reading <br />Third Reading <br />Public Hearing <br />Budget Advisory <br />COUNCIL BILL <br />Originating Department <br />Contact Person <br />Phone Number <br />FOR AGENDA OF <br />Initialed by: <br />Department Head <br />CAA <br />Council President <br />Public Works <br />Ryan Sass <br />(425) 257-8942 <br />August 26, 2015 <br />Location Precedin6 Action Attachments Department(s) Approval <br />Various Intersections None Ordinance Legal, Public Works <br />Amount Budgeted $1,062,122 I .. <br />Expenditure Required $1,062,122 AccountNumber(s): PW 3628 <br />Budget Remaining -0- <br />Additional Required -0- <br />DETAILED SUMMARY STATEMENT: <br />This project will evaluate approximately 2,000 stop and yield signs, "4 -Way " and "All -Way" plaques, and <br />sign. posts throughout the City for compliance with Manual on Uniform Trafic Control Devices (MUTCD) <br />standards, as modified by WAC 468-95. <br />Signage will be upgraded as necessary with high intensity prismatic sheeting. A Federal Highway Safety <br />Improvement Program (HSIP) grant will provide $965,566 for design and construction of the improvements <br />with local matching funds providing the balance. <br />The budget for this project is $1,062,122 and the source of funds are: <br />Federal Grant (HSIP) $965,566 <br />Fund 119 — Street Improvements <br />Total Funds <br />96-5.56 <br />$1.062.122 <br />10N (Exact action requested o Colincil): <br />dopt ail v rdLl'?'i'_('.�=. !:r�. Li�1G a spec ai inap o l i'1'L1Ci1t iDroject en` d ..x.11.) \'�'i�i: 1Ll_1sCL'Lll�=1 l-llln`,'- rU.il�l. <br />csia7_ 1 tl '�'��1 ostS tQi' i�le ll117"i"0\e111ellT. <br />J: �_o _ 1 Lo .a `u nul i <br />31 <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.