Laserfiche WebLink
600 University Street,Suite 610 <br /> ,,,' Seattle,WA 98101 <br /> (206)622-0222 Fax(206)622-4764 <br /> moffott & nichol <br /> SITE VISIT MEMO <br /> To: Greg Dawsey(POE) <br /> From: Stuart Stringer, PE (M&N) <br /> Date: 28 October 2014 <br /> Subject: Port of Everett ESY Bulkhead Site Visit and Sheet Pile Inspection <br /> M&N Job No.: 8057-03 <br /> Date of Visit: 10 October 2014 <br /> Location: Port of Everett Central Marina <br /> Purpose: Observe current progress and inspection of sheet pile installation. Discussion of failing <br /> existing Segment B bulkhead wall and revision to the south termination wall (per RFI <br /> 11). <br /> Time: 10:00 am—1:00 pm <br /> Weather: Overcast <br /> Personnel in Attendance: <br /> Stuart Stringer(Moffatt & Nichol) <br /> Elise Gronewald (Port of Everett) <br /> Dave Pischer(Landau) <br /> Summary: <br /> Stuart Stringer from Moffatt & Nichol meet up with Elise Gronewald from the Port of Everett and Dave <br /> Pischer from Landau to observe the current progress of the sheet pile installation and perform an <br /> inspection of the sheet piles. Additionally there was discussion of the failing existing timber bulkhead in <br /> Segment B, and the proposed revisions to the south termination wall per RFI 11. <br /> At the time of the site visit the sheet piles had been installed to their final tip elevations for all of <br /> Segment A and most of Segment B. Only a few sheets remained to be driven along the south end of <br /> Segment B along with the termination wall. Overall the sheet piles appeared to be installed in position, <br /> plumb, and with minimal offset from the wall alignment. <br />