My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1018 14TH ST 2023-02-09
>
Address Records
>
14TH ST
>
1018
>
1018 14TH ST 2023-02-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 1:07:39 PM
Creation date
5/17/2017 10:00:14 AM
Metadata
Fields
Template:
Address Document
Street Name
14TH ST
Street Number
1018
Notes
BULKHEAD PLATFORM GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
600 University Street,Suite 610 <br /> ,,,' Seattle,WA 98101 <br /> (206)622-0222 Fax(206)622-4764 <br /> moffott & nichol <br /> SITE VISIT MEMO <br /> To: Greg Dawsey(POE) <br /> From: Stuart Stringer, PE (M&N) <br /> Date: 28 October 2014 <br /> Subject: Port of Everett ESY Bulkhead Site Visit and Sheet Pile Inspection <br /> M&N Job No.: 8057-03 <br /> Date of Visit: 10 October 2014 <br /> Location: Port of Everett Central Marina <br /> Purpose: Observe current progress and inspection of sheet pile installation. Discussion of failing <br /> existing Segment B bulkhead wall and revision to the south termination wall (per RFI <br /> 11). <br /> Time: 10:00 am—1:00 pm <br /> Weather: Overcast <br /> Personnel in Attendance: <br /> Stuart Stringer(Moffatt & Nichol) <br /> Elise Gronewald (Port of Everett) <br /> Dave Pischer(Landau) <br /> Summary: <br /> Stuart Stringer from Moffatt & Nichol meet up with Elise Gronewald from the Port of Everett and Dave <br /> Pischer from Landau to observe the current progress of the sheet pile installation and perform an <br /> inspection of the sheet piles. Additionally there was discussion of the failing existing timber bulkhead in <br /> Segment B, and the proposed revisions to the south termination wall per RFI 11. <br /> At the time of the site visit the sheet piles had been installed to their final tip elevations for all of <br /> Segment A and most of Segment B. Only a few sheets remained to be driven along the south end of <br /> Segment B along with the termination wall. Overall the sheet piles appeared to be installed in position, <br /> plumb, and with minimal offset from the wall alignment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.