Laserfiche WebLink
Project File M&N#:8057-03 <br /> 28 October 2014 Site Visit Memorandum <br /> i - <br /> Figure 2: Segment B Sheet Piles Installed and Cut Off <br /> Figure 3 shows the south termination wall near the transition to Segment 3.The termination wall sheets <br /> appear to be in the correct plan location (as revised by RFI 12).There is some significant settlement <br /> around the termination wall where the new sheets penetrate the existing timber bulkhead.This <br /> indicates that the existing wall has deflected towards the new sheet piles. In some places the ground <br /> behind the existing bulkhead appears to have settled over a foot.The Contractor has placed ecology <br /> blocks around the affected area. <br /> ,,,1 3 <br />