Laserfiche WebLink
Project File M&N#:8057-03 <br /> 28 October 2014 Site Visit Memorandum <br /> � r <br /> 717 r <br /> i <br /> Figure 1: Segment A Sheet Piles Installed and Cut Off <br /> Figure 2 shows the Segment A and B sheets cutoff to their final elevation.The cuts look clean and level. <br /> After the sheets were cut a slight deviation in wall alignment is visible at the south end of Segment A <br /> near the transition to Segment B. This is visible in Figure 2 above the yellow plastic boom.The wall <br /> appears to be out of position slightly to the west. Due to access limitations, it was not possible to <br /> determine if the deviation is due to the sheets being out of plumb or out of plan position. <br /> "11 2 <br />