Laserfiche WebLink
Project File M&N#: 8057-03 <br /> 18 February 2015 Site Visit Memorandum <br /> indicated that they would follow the approved sequence and build the concrete deadman before <br /> backfilling behind the new sheet piles. <br /> 4-� <br /> d <br /> ,w <br /> Figure 1: Marine Backfilling Operations <br /> After meeting with the Contractor the representatives from Moffatt& Nichol and the Port walked the <br /> site to observe current progress. Figure 1 shows an overview of the sheet pile bulkhead with the <br /> Contractors dredging equipment in the background. At the time of the site visit the Contractor was <br /> completing the southernmost portion of the marine backfilling operation.The yellow excavator was <br /> being used to place the marine backfill in front of the sheet pile wall. <br /> 1/„ 2 <br />