Project File M&N#:8057-03 <br /> 18 February 2015 Site Visit Memorandum <br /> tY•n ate. 6 t <br /> r <br /> A 1 4 y <br /> pp <br /> r <br /> i <br /> 1 <br /> ry r.1 <br /> Figure 2: Progress of Segment B Concrete Deadman <br /> Figure 2 shows the northern portion of the Segment B concrete deadman that was recently poured. The <br /> temporary steel H-piles are still in place behind the deadman formwork. At the time of the visit workers <br /> were placing rebar into the forms to begin tying the southern portion of the deadman. <br /> ,/1Iq 3 <br />