Project File M&N#: 8057-03 <br /> 18 February 2015 Site Visit Memorandum <br /> ` NCM.f154 � <br /> 1 <br /> I �.r rl r ��sl 3.t• <br /> r ' <br /> Figure 3: Progress of Backfill at Diagonal Wall <br /> Figure 3 shows the progress of backfill behind the diagonal portion of the wall. It appears no backfill has <br /> been placed directly behind the new sheet piles, only above and behind the existing timber bulkhead. <br /> The soil behind the existing bulkhead had been graded and compacted close to the final elevation. <br /> killi" 4 <br />