Project File M&N#:8057-03 <br /> 18 February 2015 Site Visit Memorandum <br /> cva���� _ ♦=- y' <br /> 3 <br /> } <br /> v• <br /> I <br /> r <br /> Figure 5:Tieback Anchors at New Concrete Deadman <br /> Figure 5 shows one of the unburied tiebacks along 14'street that does not have a plastic cap installed <br /> at the deadman end of the tieback.The contract documents require grease filled plastic caps on both <br /> ends of the tieback rods (See Detail 2 on sheet S2.1, and Section 02260 3.03E.3 of the specifications). <br /> Submittal 18 also shows plastic grease filled caps at both ends. It is not clear whether the buried <br /> tiebacks have the plastic caps installed. The Port should verify this with the Contractor. If not, the <br /> Contractor will need to dig them up and install the caps per the contract documents. <br /> Additionally now that the tiebacks have been installed for most of the bulkhead,the caps should be <br /> installed on the sheet pile ends soon to prevent any corrosion. In fact there already appears to be some <br /> minor superficial rust forming on the exposed ends of the tie rods and nuts. This should be cleaned <br /> before the caps are installed and filled with grease. <br /> h111011® 6 <br />