Laserfiche WebLink
Project File M&N#:8057-03 <br /> 18 February 2015 Site Visit Memorandum <br /> i <br /> 'z a <br /> r <br /> .000. <br /> Figure 4: Structural Fill around Tiebacks <br /> Figure 4 shows the current state of backfilling behind the Segment A portion of the bulkhead.The <br /> Contractor has removed the quarry spall (drainage rock)from directly around the tiebacks.They have <br /> placed a layer of filter fabric above the drainage rock and begun backfilling with structural fill. <br /> "„ 5 <br />