My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1018 14TH ST 2023-02-09
>
Address Records
>
14TH ST
>
1018
>
1018 14TH ST 2023-02-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 1:07:39 PM
Creation date
5/17/2017 10:00:14 AM
Metadata
Fields
Template:
Address Document
Street Name
14TH ST
Street Number
1018
Notes
BULKHEAD PLATFORM GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHANNON&WILSON,INC. <br /> TABLE OF CONTENTS (cont.) <br /> Page <br /> 6.0 LIMITATIONS....................................................................................................................21 <br /> 7.0 REFERENCES.....................................................................................................................23 <br /> TABLES <br /> 1 Recommended Parameters for Development of P-Y Curves Using LPILErLUs <br /> for Temporary Bulkhead Reinforcement <br /> 2 Recommended Parameters for Estimating Axial Capacity of Viewing Platform <br /> Pipe Piles and Development of P-Y Curves using LPILEPLus <br /> FIGURES <br /> 1 Vicinity Map <br /> 2 Site and Exploration Plan <br /> 3 Generalized Subsurface Profile A-A' (2 sheets) <br /> 4 Horizontal Response Spectrum Site Class D <br /> 5 Recommended Lateral Earth Pressures for Segments A, B, and C <br /> 6 Recommended Lateral Earth Pressures for Segment D <br /> 7 Mobilized Passive Lateral Earth Pressure vs. Movement <br /> 8 Recommended Lateral Earth Pressures for Deadman Anchor <br /> 9 Lateral Earth Pressures, Temporary Dredged Condition for 10' Street Bulkhead <br /> 10 Global Stability Analyses, Segment A, B, and C <br /> I I Global Stability Analyses, Temporary Dredged Case, SeMment C <br /> 12 Global Stability Analyses, Temporary Dredged Case, 14' Street Bulkhead <br /> APPENDICES <br /> A Subsurface Explorations <br /> B Geotechnical Laboratory Testing Procedures and Results <br /> C Liquefaction Analyses Results <br /> D Numerical Soil-Structure Interaction Analysis Results <br /> E Important Information About Your Geotechnical/Environmental Report <br /> 21-1-21761-003-RI J.doca/wp/dp 21-1-?1 761-00, <br /> ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.