My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1018 14TH ST 2023-02-09
>
Address Records
>
14TH ST
>
1018
>
1018 14TH ST 2023-02-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 1:07:39 PM
Creation date
5/17/2017 10:00:14 AM
Metadata
Fields
Template:
Address Document
Street Name
14TH ST
Street Number
1018
Notes
BULKHEAD PLATFORM GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
600 University Street,Suite 610 <br /> "" Seattle,WA 98101 <br /> (206)622-0222 Fax(206)622-4764 <br /> motfatt & nichoi www.mokat`.rnie'noicem <br /> SITE VISIT MEMO <br /> To: Erik Gerking(POE) <br /> From: Stuart Stringer, PE (M&N) <br /> Date: 26 March 2015 <br /> Subject: Port of Everett ESY Bulkhead Pile Cap Rebar Inspection <br /> M&N Job No.: 8057-03 <br /> Date of Visit: 26 March 2015 <br /> Location: Port of Everett Central Marina <br /> Purpose: Inspection of the Pile Cap Rebar <br /> Time: 8:00am—12:00pm <br /> Weather: Sunny <br /> Personnel in Attendance: <br /> Stuart Stringer (Moffatt& Nichol) <br /> Elise Gronewald (Port of Everett) <br /> Summary: <br /> Stuart Stringer from Moffatt& Nichol met with Elise Gronewald from the Port of Everett at approx. <br /> 8:00am to perform the final bulkhead pile cap rebar inspection and observe the first concrete pour.The <br /> rebar was inspected to verify that the items noted on 24 March 2015 were addressed.The Contractor <br /> was finished installing the rebar at the time of the inspection, and was setting up for the concrete pour <br /> to begin at 9:00am. Overall the pour went smoothly with no issues. <br /> Figures 1 through 3 show the completed rebar cages just prior to the concrete pour. Figure 4 shows the <br /> portion of the pile cap with the viewing platform seat being finished after the concrete placement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.