Laserfiche WebLink
600 University Street,Suite 610 <br /> "" Seattle,WA 98101 <br /> (206)622-0222 Fax(206)622-4764 <br /> motfatt & nichoi www.mokat`.rnie'noicem <br /> SITE VISIT MEMO <br /> To: Erik Gerking(POE) <br /> From: Stuart Stringer, PE (M&N) <br /> Date: 26 March 2015 <br /> Subject: Port of Everett ESY Bulkhead Pile Cap Rebar Inspection <br /> M&N Job No.: 8057-03 <br /> Date of Visit: 26 March 2015 <br /> Location: Port of Everett Central Marina <br /> Purpose: Inspection of the Pile Cap Rebar <br /> Time: 8:00am—12:00pm <br /> Weather: Sunny <br /> Personnel in Attendance: <br /> Stuart Stringer (Moffatt& Nichol) <br /> Elise Gronewald (Port of Everett) <br /> Summary: <br /> Stuart Stringer from Moffatt& Nichol met with Elise Gronewald from the Port of Everett at approx. <br /> 8:00am to perform the final bulkhead pile cap rebar inspection and observe the first concrete pour.The <br /> rebar was inspected to verify that the items noted on 24 March 2015 were addressed.The Contractor <br /> was finished installing the rebar at the time of the inspection, and was setting up for the concrete pour <br /> to begin at 9:00am. Overall the pour went smoothly with no issues. <br /> Figures 1 through 3 show the completed rebar cages just prior to the concrete pour. Figure 4 shows the <br /> portion of the pile cap with the viewing platform seat being finished after the concrete placement. <br />