Laserfiche WebLink
Project File M&N#: 8057-03 <br /> 26 March 2015 Site Visit Memorandum <br /> All of the items noted in the preliminary rebar inspection were resolved with two minor clear cover <br /> exceptions.The Contractor adjusted the rebar to provide at least 3 inches of clear cover in these areas. <br /> ,. hyo ---• .__ <br /> w <br /> v �d' <br /> r' <br /> „c- <br /> r�7 <br /> .J <br /> A,pI. yf <br /> Figure 1: Segment A Typical Lower Pile Cap Reinforcement <br /> ®�� 2 <br />