My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1018 14TH ST 2023-02-09
>
Address Records
>
14TH ST
>
1018
>
1018 14TH ST 2023-02-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 1:07:39 PM
Creation date
5/17/2017 10:00:14 AM
Metadata
Fields
Template:
Address Document
Street Name
14TH ST
Street Number
1018
Notes
BULKHEAD PLATFORM GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
600 University Street,Suite 610 <br /> "„ Seattle,WA 98101 <br /> (206)622-0222 Fax(206)6221764 <br /> m o f f a t t & n i c h o l wm.moffattnichol.com <br /> SITE VISIT MEMO <br /> To: Erik Gerking(POE) <br /> From: Stuart Stringer, PE (M&N) <br /> Date: 15 April 2015 <br /> Subject: Port of Everett ESY Bulkhead Pile Cap Rebar Inspection <br /> M&N Job No.: 8057-03 <br /> Date of Visit: 14 April 2015 <br /> Location: Port of Everett Central Marina <br /> Purpose: Observe Progress of Construction & Check Pile Cap Rebar <br /> Time: 11:30am—1:00pm <br /> Weather: Sunny <br /> Personnel in Attendance: <br /> Stuart Stringer(Moffatt& Nichol) <br /> Elise Gronewald (Port of Everett) <br /> Summary: <br /> Stuart Stringer from Moffatt & Nichol met with Elise Gronewald from the Port of Everett at approx. <br /> 11:30am to look at the pile cap rebar for the fourth concrete pour.This pour will consist of the Segment <br /> B overhang between WP3 and WP4 and the Segment A curb on the overhang along 14th Street.The <br /> shaded areas in Figures 1 and 2 show the extent of concrete pour 4. <br /> At the time of the site visit the Contractor was mostly complete with the rebar installation,formwork <br /> setup, and electrical conduit placement.All of the rebar appeared to be placed in accordance with the <br /> contract documents with a few minor exceptions.These were pointed out to the contractor, and were <br /> quickly resolved. <br /> The electrical conduit had a few minor placement issues which were pointed out to the contractor and <br /> subsequently resolved. During the site visit a minor change was made for the placement of the electrical <br /> conduit in the overhang portion of the pile cap. Detail 6 on Sheet E2.0 shows the conduit running along <br /> the centerline of the curb(centered 9 inches from the front face of the overhang).After consultation <br />
The URL can be used to link to this page
Your browser does not support the video tag.