Project File M&N#: 8057-03 <br /> 15 April 2015 Site Visit Memorandum <br /> Figures 3 through 5 show the pile cap rebar and electrical conduit in place mostly ready for concrete <br /> placement. At the end of the site visit a few items had not been fully completed.The Port should verify <br /> the following items have been completed before the scheduled concrete pour on Thursday morning: <br /> Segment A Curb: <br /> • The curb formwork had not yet been installed. Check that there is tin of clear cover to all bars. <br /> • The rebar needs to be cleaned of concrete from last week's pour(see Figure 5) <br /> Segment B Overhang: <br /> • Chamfer strips at the top of pile cap (landslide top corner) need to be installed. <br /> • 3/4" reveal (chamfer strip) on the front face of the overhang need to be installed. <br /> • Drip groove at the soffit of the overhang needs to be installed. <br /> • Some of the conduit at the plinths (the 4th and 5th plinths from the south end of the bulkhead) <br /> were slightly out of position in the E-W direction.They were gin and 13in from the front face <br /> (waterside) of the overhang respectively. Per the discussion in the field with the electrical <br /> engineer they should be placed about 10.5in from the front face of the overhang. <br /> „'1 3 <br />